Source:Industry News Release time:2022-11-28 Clicks:0 Popular:Reduction motor manufacturer

In the actual production of enterprises, it is often found that after some planetary reducers have been idle for a period of time, the insulation resistance of the reducer windings will decrease when restarted. If it is put into operation rashly, it may cause the insulation breakdown of the planetary reducer coil and cause an accident. So if such a problem occurs, how to solve it?
The problem of moisture in the planetary reducer can be solved by using external heat source heating. For wet equipment, first disassemble and inspect it, and then bake it indoors with a high-power incandescent bulb, or dry it in a drying room. This method is simple to operate, but it is only suitable for asteroid reducers, making it easy to disassemble and inspect.
For large and medium-sized equipment that is difficult to dismantle and inspect, the workload is relatively large and the feasibility is also reduced. It should be noted that when using this method, the bulb or heat source cannot be too close to the coil to avoid burning the coil. The outer shell of the planetary reducer can be covered with canvas and other insulation items.
Recommended reading
Design principles of hard tooth surface reducer in automation applications
Related Information
CGX085
2021-01-13CGH-090L1-10-P1
2020-12-21CGXZ115
2021-01-13Accessories
2020-12-21CGX115
2021-01-13Planetary reducer
2021-04-15CGXZK060
2021-01-13CGX042
2021-01-13Stepper motor
2020-12-21Governor
2021-04-17CGXZ115
2021-01-13Accessories
2020-12-21CGXK115
2021-01-13CGF-060L1-10-P2
2020-12-21CGX042
2021-01-13Planetary reducer
2021-04-15Stepper motor
2021-04-14Planetary reducer
2021-04-15